<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.2900.3059" name=GENERATOR></HEAD>
<BODY>
<DIV dir=ltr align=left><SPAN class=675202620-01052007><FONT face=Arial 
color=#0000ff size=2>In the SD Wizard, screen 14, you can specify two schedules 
(Main & Alt) and then specify the Alt schedule on screen 18 (everything 
might be on Main and your corridors could be on the Alt). I don't think this is 
accessible in the DD Wizard, unless you trick the DD Wizard w/specifying a task 
lighting load and schedule for the corridors on screens 15 and 16 (of the DD 
Wizard).</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=675202620-01052007><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN> </DIV>
<DIV dir=ltr align=left><SPAN class=675202620-01052007><FONT face=Arial 
color=#0000ff size=2>In the Detailed Edit mode, you can specify five different 
lighting systems/loads and schedules per zone. This can be accessed by clicking 
the Internal Loads button and then double-clicking a zone and selecting the 
Lighting tab. You can also edit this info in the Spreadsheet tab under Internal 
Loads.</FONT></SPAN></DIV>
<DIV> </DIV><!-- Converted from text/rtf format -->
<P><SPAN lang=en-us><FONT face=Arial size=2>Mark Nieman, PE, CEM</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT face=Arial size=2>Sr. Energy Engineer</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT face=Arial size=2>McKinstry Essention</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT face=Arial size=1>Direct: (206) 
832-8152</FONT></SPAN> <BR><SPAN lang=en-us><FONT face=Arial size=1>Cell: (206) 
510-4760</FONT></SPAN> <BR><SPAN lang=en-us><FONT face=Arial size=1>FAX: (206) 
832-8552</FONT></SPAN> <BR><SPAN lang=en-us><FONT face=Arial size=1><A 
href="http://www.mckinstry.com/">http://www.mckinstry.com</A></FONT></SPAN> 
<BR><SPAN lang=en-us><I><FONT face=Arial size=1>"For The Life Of Your 
Building"</FONT></I></SPAN> </P>
<DIV> </DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> BLDG-SIM@gard.com 
[mailto:BLDG-SIM@gard.com] <B>On Behalf Of </B>Andy McNamara<BR><B>Sent:</B> 
Tuesday, May 01, 2007 12:52 PM<BR><B>To:</B> 
BLDG-SIM@gard.com<BR><B>Subject:</B> [BLDG-SIM] eQUEST multiple lighting 
schedules<BR></FONT><BR></DIV>
<DIV></DIV>I am working within the NYSERDA Energy Star modeling program and it 
stipulates a specific lighting schedule for the apartments that varies by the 
hour of the day and a "24-hour ON" schedule for the corridors.  Is there a 
way, without separating out the corridors as a separate shell, of modeling two 
(or more) distinct lighting schedules for a building? <BR><BR>Thank you to 
Gerald and Scott for your help on my last question specific to this 
program.<BR><BR>Best,<BR>Andy<BR clear=all><BR>-- 
<BR>****************************************************<BR>Andrew McNamara, 
LEED AP <BR>Bright Power, Inc.<BR>43 W. 33rd St.<BR>Suite 302<BR>New York, NY 
10001<BR>p. 212.803.5868<BR>f. 866.379.8026<BR>c. 917.974.4499<BR><A 
href="mailto:amcnamara@brightpower.biz">amcnamara@brightpower.biz</A><BR><A 
href="http://www.brightpower.biz">www.brightpower.biz</A> 
<PRE>

===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM@GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE@GARD.COM
</PRE></BODY></HTML>