I am running an eQUEST model under a New York State program that requires a very specific fractional lighting schedule set by the hour of the day. I know the DOE-2 input should look like this:<br><br>LTG-1 = DAY-SCHEDULE<br>
TYPE               = FRACTION <br>HOURS              = 
(1,24)<br>VALUES             = (  0.008,  0.008,  0.008,  0.008,  0.024,  0.050,  0.056,  
0.050,<br>                      0.022,0.015...)  <br><br>I know that schedules can be changed in the detailed data interface (cell by cell, very tedious), but am wondering if there is a repeatable way to implement the same lighting schedule on multiple projects.  Can I enter this as a library item that could be easily called upon?
<br><br>Would it be possible to define a lighting schedule (fractional) and then call it up from within the wizard or the detailed data interface?<br><br>Any help would be most appreciated!<br><br>Thank you.<br><br>Andy McNamara
<br clear="all"><br>-- <br>****************************************************<br>Andrew McNamara, LEED AP<br>Bright Power, Inc.<br>43 W. 33rd St.<br>Suite 302<br>New York, NY 10001<br>p. 212.803.5868<br>f. 866.379.8026<br>
c. 917.974.4499<br><a href="mailto:amcnamara@brightpower.biz">amcnamara@brightpower.biz</a><br><a href="http://www.brightpower.biz">www.brightpower.biz</a>