<span class="gmail_quote"><br></span>
<div>Hi,</div>
<div> </div>
<div>I have two questions about BPS calibration. In literature almost all methodology on calibration is about to calibrate BPS with actual/measured data or utility bills of real building. On the other hand, recently there are many disscussions and researches are held on using/integrating BPS in early design scheme analysis. Now my question is; during this early/schematic phase of design, with very limited information about the future building, how can we calibrate BPS to simulate our unique design? During the early design phase we have almost no idea about the final project of the building because it is still under-design. 
</div>
<div> </div>
<div>The other question is; For sensitivity analysis of a representative box model (with only 4 zones) is it necessary to calibrate BPS? If so, the first question is idem..The box model represents an early design scheme of a building and the aim is to reveal the effective parameters on energy consumption of the model by sensitivity analysis... 
</div>
<div> </div>
<div>Anyway, If any of you have an idea, it will be appreciated.....</div>
<div> </div>
<div>Thanks in advance...</div><span class="sg">
<div> </div>
<div>Gulsu Ulukavak Harputlugil</div></span>