<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>I'm getting some
strange output reporting in my doe2 SIM file under energy end uses in BEPS and
BEPU simulation file reports for the end use "Misc Equipment."
</SPAN></FONT><FONT face=Verdana size=2><SPAN class=401192618-07072006><FONT
face=Verdana size=2><SPAN class=401192618-07072006>It seems that some of
my space heating and cooling energy use is being directed to the "Misc
Equip" end use category in the simulation file....</SPAN></FONT></DIV>
<DIV>
<DIV><FONT face=Verdana size=2><SPAN
class=401192618-07072006></SPAN></FONT> </DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>Has anyone
experienced something similar? Anyone know why this might be occurring and
how to correct this?</SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN
class=401192618-07072006></SPAN></FONT> </DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>more detail
below.....</SPAN></FONT></DIV></SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN
class=401192618-07072006></SPAN></FONT> </DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>I'm using eQuest
v3.55, and am doing an ASHRAE 90.1-1999 ECB method energy study, so I have a
"Design" case model of the building according to construction documents, and
have backed out a "Budget" case model following the ECB guidelines in 90.1 (and
associated HVAC system map changes).</SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN
class=401192618-07072006></SPAN></FONT> </DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>CASE
1</SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>All
Equipment plug loads assigned to spaces are assigned as electric loads, and
are identical between by "Design" case model and my "Budget" case model.
No other internal energy sources are defined in either model. All
schedules are identical between models. No process loads are assigned to
any of my circulation loops or plant equipment.</SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>The differences
between input files are limited to: lighting power densities, construction
types (walls, roof, glass, etc), and HVAC system types are different due
to following the ECB modeling methodology.</SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>In my SIM
file under "Misc Equip" in the BEPS/BEPU reports, I have very different
electrical KWH used under "Misc Equip", and Natural gas uses have appeared in
this same "Misc Equip" category, again with very different total Therms
used.... </SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>Does anyone know
why the electric use under "Misc Equip" could be different between the two
models, and how natural gas use might have appeared in the "Misc Equip" end use
category</SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN
class=401192618-07072006></SPAN></FONT> </DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>CASE
2</SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>I tried reworking
the input file a bit to make the "Design" and "Budget" cases match in all of the
HVAC equipment (i.e. including all HVAC systems and thermal zones, and HVAC circ
loops and plant equipment are now identical). So, f</SPAN></FONT><FONT
face=Verdana size=2><SPAN class=401192618-07072006>or this run, the only
differences between the two input files are in Lighting loads, and Construction
types. </SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>In this run, the
BEPS/BEPU reports for the two models "Misc Equip" end use category are
still different between the two models for both electric KWH used, and natural
gas Therms, but the difference between the models is much smaller than in "Case
1" above where the HVAC system types were different.....
</SPAN></FONT></DIV>
<DIV><FONT face=Verdana size=2></FONT><FONT face=Verdana size=2></FONT><FONT
face=Verdana size=2></FONT><FONT face=Verdana size=2></FONT> </DIV>
<DIV><FONT face=Verdana size=2><SPAN class=401192618-07072006>Please let me know
if you have any advice on how to correct this...</SPAN></FONT></DIV>
<DIV><BR><SPAN class=401192618-07072006></SPAN><FONT face=Verdana><FONT
size=2>Thank you,</FONT></FONT></DIV>
<DIV><FONT><FONT size=2><SPAN
class=401192618-07072006></SPAN></FONT></FONT><SPAN
class=401192618-07072006></SPAN><FONT face=Verdana><FONT size=2>K<SPAN
class=401192618-07072006>ate</SPAN></FONT></FONT></DIV><PRE>
===========================
You received this e-mail because you are subscribed
to the BLDG-SIM@GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE@GARD.COM
</PRE></BODY></HTML>