<META HTTP-EQUIV="Content-Type" CONTENT="text/html; charset=iso-8859-1">
<html                                                                                                                                                                                                 >

<head>

<meta name=Generator content="Microsoft Word 11 (filtered medium)">




<style>
<!--
                       
 font-face
        {font-family:"Copperplate Gothic Light";}
                        
 p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;
        margin-bottom:.0001pt;
        font-size:12.0pt;
        font-family:"Times New Roman";}
a:link, span.MsoHyperlink
        {color:blue;
        text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
        {color:purple;
        text-decoration:underline;}
p
        {
        margin-right:0in;
        margin-left:0in;
        font-size:12.0pt;
        font-family:"Times New Roman";}
span.EmailStyle18
        {
        font-family:Arial;
        color:windowtext;}
span.EmailStyle19
        {
        font-family:Arial;
        color:navy;}

div.Section1
        {page:Section1;}
-->
</style>

</head>

<body lang=EN-US link=blue vlink=purple>
<DIV id=idOWAReplyText66784 dir=ltr>
<DIV dir=ltr><FONT face=Arial color=#000000 size=2>Scott,</FONT></DIV>
<DIV dir=ltr><FONT face=Arial size=2></FONT> </DIV>
<DIV dir=ltr><FONT face=Arial size=2>I think you should be using the actual 
electric utility rate and calculating electric consumption and electric demand 
costs because that's what the owner is going to be paying.  You should also 
be incuding taxes, monthly fees and any additional riders or tariffs that 
might apply.  It would be pretty tough to justify a blended kWh cost for a 
new construction project because in order to be relevant it would need to be 
based on the actual operation of the building.</FONT></DIV>
<DIV dir=ltr> </DIV>
<DIV dir=ltr><FONT face=Arial size=2>Furthermore with regard to whether using 
the actual rate will hurt your modeling results....the goal of LEED is not 
to "win as many points as you can" but rather to promote efficient, 
sustainable buildings. The goal of using energy modeling should be to 
improve the overall building design.  If you don't like the results of 
the energy model make design changes untill you do.  </FONT></DIV>
<DIV dir=ltr><FONT face=Arial size=2></FONT> </DIV>
<DIV dir=ltr><FONT face=Arial size=2>For example if your client has a demand 
ratchet and your building design creates a large summer cooling peak, 
the client will be paying for that all year long.  If you used a 
blended rate you won't see the effects of that in the utility cost.  
</FONT></DIV>
<DIV dir=ltr><FONT face=Arial size=2></FONT> </DIV>
<DIV dir=ltr><FONT face=Arial size=2>I hope this helps.</FONT></DIV>
<DIV dir=ltr><FONT face=Arial size=2></FONT> </DIV>
<DIV dir=ltr><FONT face=Arial size=2>Mike</FONT></DIV>
<DIV dir=ltr><FONT face=Arial size=2></FONT> </DIV>
<DIV dir=ltr><FONT face=Arial size=2></FONT> </DIV>
<DIV dir=ltr><FONT face=Arial color=#000000 size=2></FONT> </DIV></DIV>
<DIV id=idSignature13382 dir=ltr>
<DIV><FONT face=Arial color=#000000 size=2>
<DIV><FONT face="Times New Roman" color=#0000ff><STRONG>Michael Tillou, 
PE</STRONG></FONT></DIV>
<DIV><FONT face="Times New Roman" color=#0000ff><STRONG>etc Group, 
Inc.</STRONG></FONT></DIV>
<DIV><FONT face="Times New Roman"><FONT color=#0000ff><STRONG>PO Box 7 
Williamstown</STRONG></FONT><FONT color=#0000ff><STRONG>, MA 
01267</STRONG></FONT></FONT></DIV>
<DIV><FONT color=#0000ff><STRONG><FONT face="Times New Roman">Ph. (413) 
458-9870   Mbl. (413) 652-1087 </FONT></STRONG></FONT></DIV>
<DIV><STRONG><FONT face="Times New Roman" 
color=#0000ff></FONT></STRONG></FONT><BR> </DIV>
<DIV>
<HR tabIndex=-1>
</DIV>
<DIV><FONT face=Tahoma size=2><B>From:</B> bldg-sim@gard.com on behalf of Scott 
Runyon<BR><B>Sent:</B> Fri 9/30/2005 9:35 AM<BR><B>To:</B> 
bldg-sim@gard.com<BR><B>Subject:</B> [bldg-sim] Utility Rates and 
eQUEST<BR></FONT><BR></DIV></DIV></DIV>
<DIV>
<DIV class=Section1>
<P class=MsoNormal><FONT face=Arial size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: Arial">I am a new user of eQUEST and am 
trying to model a building for LEED energy savings purposes. I am comparing my 
design building to the ASHRAE 90.1 Code requirements of the same building. 
</SPAN></FONT></P>
<P class=MsoNormal><FONT face=Arial size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: Arial"></SPAN></FONT> </P>
<P class=MsoNormal><FONT face=Arial size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: Arial">When setting up my electricity rates 
I can use Block Charges and Ratchets. If I was able to find an average rate per 
kWh, how much would this impact my energy reports? I am concerned that trying to 
get too complicated by using multiple types of rates could actually hurt my 
model more than help it.</SPAN></FONT></P>
<P class=MsoNormal><FONT face=Arial size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: Arial"></SPAN></FONT> </P>
<P class=MsoNormal><FONT face=Arial size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: Arial">Any thoughts would be 
appreciated</SPAN></FONT></P>
<P><FONT face="Copperplate Gothic Light" size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: 'Copperplate Gothic Light'">Scott 
Runyon</SPAN></FONT><FONT face="Copperplate Gothic Light" size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: 'Copperplate Gothic Light'"> <BR>RMF 
Engineering, Inc.<BR>Design Engineer</SPAN></FONT></P>
<P><FONT face="Copperplate Gothic Light" size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: 'Copperplate Gothic Light'">474 Wando Park 
Blvd, Suite 100</SPAN></FONT><FONT face="Copperplate Gothic Light" size=2><SPAN 
style="FONT-SIZE: 10pt; FONT-FAMILY: 'Copperplate Gothic Light'"> <BR>Mt. 
Pleasant, SC 29464 <BR>Phone: 843-971-9639 Ext. 108 <BR>Fax: 843-971-9641 
</SPAN></FONT></P>
<P class=MsoNormal><FONT face="Times New Roman" size=3><SPAN 
style="FONT-SIZE: 12pt"></SPAN></FONT> </P></DIV><PRE>==================
You received this e-mail because you are subscribed 
to the BLDG-SIM@GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE@GARD.COM
</PRE></DIV><PRE>

===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM@GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE@GARD.COM
</PRE></body>



</html>