<DIV><SPAN class=765513518-29092005><FONT face=Arial size=2>I am trying to
simulate the use of multiple bio-diesel generators that operate at different
times of the day to provide electricity and use Heat Recovery to heat domestic
hot water. Following Example 2 on page 340 of the DOE22Vol3-Topics manual
I created a flag schedule (with 0's and either or 1's to track the load or 5's
to run at max) and then used that schedule with a Utility Electric Meter to
operate the generators. This works fine when there is only 1
generator. When I try to do it with 4 generators with different operating
schedules it doesn't seem to work. Does anyone have any tips on who to do
this?</FONT></SPAN></DIV>
<DIV><SPAN class=765513518-29092005><FONT face=Arial
size=2></FONT></SPAN> </DIV>
<DIV><SPAN class=765513518-29092005><FONT face=Arial
size=2>Thanks,</FONT></SPAN></DIV>
<DIV><SPAN class=765513518-29092005><FONT face=Arial
size=2></FONT></SPAN> </DIV><FONT face="Courier New" size=2>
<DIV><FONT face=Arial>Bryce Munger</FONT></DIV>
<DIV><A href="http://www.bhengineers.com/"><FONT face=Arial color=#2d73b9 font
text-decoration:none>Balzhiser & Hubbard Engineers</FONT></A><BR><FONT
face=Arial size=1>Mechanical - Electrical - Civil - Energy - Lighting -
Surveying - Commissioning - Sustainability<BR>100 West 13th Avenue, Eugene,
Oregon 97401 (541) 686-8478 <I>fax</I> (541) 345-5303
</FONT></DIV></FONT>
<DIV> </DIV><PRE>
===========================
You received this e-mail because you are subscribed
to the BLDG-SIM@GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE@GARD.COM
</PRE></BODY></HTML>