<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META HTTP-EQUIV="Content-Type" CONTENT="text/html; charset=iso-8859-1">


<META content="MSHTML 6.00.2900.2722" name=GENERATOR></HEAD>
<BODY>
<DIV><SPAN class=765513518-29092005><FONT face=Arial size=2>I am trying to 
simulate the use of multiple bio-diesel generators that operate at different 
times of the day to provide electricity and use Heat Recovery to heat domestic 
hot water.  Following Example 2 on page 340 of the DOE22Vol3-Topics manual 
I created a flag schedule (with 0's and either or 1's to track the load or 5's 
to run at max) and then used that schedule with a Utility Electric Meter to 
operate the generators.  This works fine when there is only 1 
generator.  When I try to do it with 4 generators with different operating 
schedules it doesn't seem to work.  Does anyone have any tips on who to do 
this?</FONT></SPAN></DIV>
<DIV><SPAN class=765513518-29092005><FONT face=Arial 
size=2></FONT></SPAN> </DIV>
<DIV><SPAN class=765513518-29092005><FONT face=Arial 
size=2>Thanks,</FONT></SPAN></DIV>
<DIV><SPAN class=765513518-29092005><FONT face=Arial 
size=2></FONT></SPAN> </DIV><FONT face="Courier New" size=2>
<DIV><FONT face=Arial>Bryce Munger</FONT></DIV>
<DIV><A href="http://www.bhengineers.com/"><FONT face=Arial color=#2d73b9 font 
text-decoration:none>Balzhiser & Hubbard Engineers</FONT></A><BR><FONT 
face=Arial size=1>Mechanical - Electrical - Civil - Energy - Lighting - 
Surveying - Commissioning - Sustainability<BR>100 West 13th Avenue, Eugene, 
Oregon 97401  (541) 686-8478  <I>fax</I> (541) 345-5303 
</FONT></DIV></FONT>
<DIV> </DIV><PRE>

===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM@GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE@GARD.COM
</PRE></BODY></HTML>