<DIV><SPAN class=850591515-13102003>eQUEST would allow you to quickly build 
buildings using the Schematic Design Wizard.  The Schematic Design Wizard 
has good defaults for many building types.  Depending on the accuracy you 
want initially, you could build one large building very quickly or you could 
build several models of future buildings and import them all into a single model 
for the central plant analysis.  This second option would also allow you to 
update the model as further information became available.</SPAN></DIV>
<DIV><SPAN class=850591515-13102003></SPAN> </DIV>
<DIV><SPAN class=850591515-13102003>If you have the first phase ready to model, 
you could do that with a multiplier, or add Schematic Design models of future 
buildings.</SPAN></DIV>
<DIV><SPAN class=850591515-13102003></SPAN> </DIV>
<DIV><SPAN class=850591515-13102003>Mike</SPAN></DIV>
<DIV><SPAN class=850591515-13102003></SPAN> </DIV>
<DIV><SPAN class=850591515-13102003></SPAN> </DIV>
<BLOCKQUOTE dir=ltr style="MARGIN-RIGHT: 0px">
  <DIV class=OutlookMessageHeader dir=ltr align=left><FONT face=Tahoma 
  size=2>-----Original Message-----<BR><B>From:</B> postman@gard.com 
  [mailto:postman@gard.com]<B>On Behalf Of </B>Brian Thornton<BR><B>Sent:</B> 
  Monday, October 13, 2003 9:09 AM<BR><B>To:</B> 
  bldg-sim@gard.com<BR><B>Subject:</B> [bldg-sim] Looking for central plant 
  energy trade-off tool for conceptual de sign<BR><BR></FONT></DIV>
  <P><FONT face=Arial size=2>Hello,</FONT> </P>
  <P><FONT face=Arial size=2>Can anyone recommend software that allows fairly 
  rapid analysis of energy trade-offs between central plant equipment and 
  configurations, when the buildings to be served and loads are still 
  speculative?  This is for a campus that will be built in phases over many 
  years, and most buildings are only loosely defined. DOE-2 will be more 
  difficult and detailed than warranted. </FONT></P>
  <P><FONT face=Arial size=2>Thank you for your input.</FONT> </P>
  <P><FONT face=Arial size=2>Brian Thornton, P.E.</FONT> <BR><FONT face=Arial 
  size=2>Lead Engineer, Energy Services</FONT> <BR><U><B><I><FONT 
  face="Arial Black" size=5>GLUMAC</FONT></I></B></U> <BR><B><FONT face=Arial 
  size=1>I N T E R N A T I O N A L</FONT></B> <BR><FONT face=Arial size=2>320 SW 
  Washington, Suite 200</FONT> <BR><FONT face=Arial size=2>Portland, Oregon 
  97204</FONT> </P>
  <P><FONT face=Arial size=2>503.227.5280  Phone </FONT><BR><FONT 
  face=Arial size=2>503.274.7674  Fax</FONT> </P><PRE>
==================
You received this e-mail because you are subscribed 
to the BLDG-SIM@GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE@GARD.COM
</PRE></BLOCKQUOTE><PRE>

===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM@GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE@GARD.COM
</PRE></BODY></HTML>