[Bldg-sim] LEED energy modeling for projects with Atomizing Humidification

Duggin, Cory Cory.Duggin at tlc-eng.com
Fri Mar 9 10:20:38 PST 2018


I recently did this on a project.  The GBCI requires the savings to be claimed as an exceptional calculation.  You must provide 3 projects built within 5 years of the project registration using steam humidification to substantiate it as the baseline.
Cory Duggin, PE, LEED AP BD+C, BEMP
Principal/Energy Modeling Wizard
USGBC MidTN Branch Leadership Group Co-chair
TLC Engineering for Architecture
direct:

615-346-1939


[just_logo_color_FINAL copy 2]


From: Bldg-sim [mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Shana Scheiber via Bldg-sim
Sent: Friday, March 09, 2018 12:14 PM
To: bldg-sim at lists.onebuilding.org
Subject: [Bldg-sim] LEED energy modeling for projects with Atomizing Humidification

Energy modelers,
How have LEED modelers been setting up their baseline when a design has atomizing humidification?  Has anyone been successful modeling electric steam humidification in a LEED baseline energy model for this scenario?  The argument for this would be that the fuels are consistent in both models.

Thank you!
Shana Scheiber  PE, CEM, LEED(r) AP ID+C
Building Performance



AEI | AFFILIATED ENGINEERS, INC.
5802 Research Park Boulevard | Madison, WI  53719

P: 608.441.6670 | F: 608.238.2614
sscheiber at aeieng.com<mailto:sscheiber at aeieng.com>  |  www.aeieng.com<http://www.aeieng.com>




-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20180309/f7b5f5e6/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 4544 bytes
Desc: image002.png
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20180309/f7b5f5e6/attachment.png>


More information about the Bldg-sim mailing list