The section on Tall Buildings was developed to study the Stack Effect infiltration in super-tall pressurized buildings.
The Excel programs estimates the infiltration without taking into account the “piston effect” of elevator movement in shafts and pressurization of stairwells. http://bepan.info/tall-bldgs
Please also look the Objectives of the Website http://bepan.info/objectives and let me know if you are interested in developing it.
The website includes several Excel programs. See http://bepan.info/contents
Proj-14 – eQ-DOE21E – Tall-Bldg – Pressurizn – Stack-Effect - Infiltr
0 - eQUEST-Input - AutoCAD-DWG - Tall-Bldg-201-Flrs - 320'x260' bldg.dwg
1a -Tall-Buildings - Introduction to Contents.docx
1b - City Land Prices - Buildings - # Floors.docx
1c - The Economist – Cities & Tall Buildings.docx
1d - Understanding High Rise Building Stack Effect - Mehdi Jalayerian.docx
2a - Excel Program - Infiltr in Tall-Bldgs - User Guide - Report-Conclusions.docx
2b - Tall-Building - Multi-Use - 8-Types of Floor-Sections - Design-Criteria.xlsx
2c - Altitude VS Air Temperature, Pressure & Density.xlsx
3a - Q€(To~Ti,Ts), Q€(Wo~W,Ws), Q€(Ho~H,Hs) is approx = 8760-Hr-Calcs.docx
3b - Location Ex. - Sum of (Ti,Ts~To, Wi,Ws~Wo & Hi,Hs~Ho) for 8760-hrs.xlsx
3c - Program to Create - Sum of (Ti-To, Wi-Wo & Hi-Ho) for 8760 Hours Wthr.xlsx
5a - Tall-Bldg-Infltr - eQUEST & Excel-Program-Summary - 85 & 180 Flrs .xlsx
5b - Tall-Bldg-Infltr - Excel-Program-Example - MINNEAPOLIS - 85-flrs.xlsx
5c - Tall-Bldg-Infltr - Excel-Program-Example - MINNEAPOLIS - 180-flrs.xlsx
5d - Tall-Bldg-Infltr - Excel-Program-Example - DUBAI - 180-flrs.xlsx
7a - Infiltration in Tall Buildings - DOE21E & eQUEST Analysis.docx
7b - Figures - Excel Program User Guide - Infiltr in Tall-Bldgs.docx
7c - Large Building Air Leakage Test Calculator.xlsx
9a - CONTAM-Library - Enclosure Leakage Areas (Infiltr-Flow at Press-Temp).xlsx
9b - CONTAM-Library - from NIST - Enclosure-Leakage-Areas.docx
11a - Tall-Bldg-EX - High-Rise Mixed-Use Bldg - eQ-DOE2-Anlysis.xlsx
11b - Tall-Bldg-EX - Hotel-Bldg Systems-Plant-Metering.xlsx
11c - Tall-Bldg-EX - Office-Bldg - Shell-Systems-Plant-Econ.xlsx
11d - Tall-Bldg-EX - High-Rise Residential-Bldg - Air-Systems Stack-Eff Press.xlsx
13a - Bldg-Stair-Zone Pressurization-Air-Supply - Fire & Smoke Control.xlsx
13b - Tall-Bldg - Hot & Humid - Cooling-Coil-Condensate-Recovery.xlsx
13c - Tall-Bldg - Water Pipe Risers - Booster Pumps - Heat Exchangers.xlsx
15 - Tall-Bldgs - Case-Studies - (to be developed).xlsx
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20130607/eef32610/attachment.htm>
More information about the Bldg-sim
mailing list