[Bldg-sim] Refrigerated Warehouse - LEED Modeling

Ryan Schmidt RSchmidt at Horizon-Engineering.com
Tue Dec 21 05:59:06 PST 2010


I have been charged with the development of a LEED energy model for a refrigerated warehouse. The design utilizes a central plant refrigeration system. The refrigeration and miscellaneous equipment may account for over 85% of the annual energy consumption. According to ASHRAE, this is all classified and process energy.

 

How can credit be realized for improved envelope and energy-efficient mechanical systems? ASHRAE has no equivalent baseline systems. Must exceptional calculation methods be used?

 

Thanks in advance!

 

Ryan Schmidt

Field Engineer

Horizon Engineering Associates, LLP

5600 77 Center Dr., Ste 105 │Charlotte, NC 28217

T: 704.523.5354 │C: 252.622.9606

www.horizon-engineering.com <http://www.horizon-engineering.com/> 

 

Demand a Higher Standard

P <blocked::http://www.P>   Please consider the environment before printing this e-mail

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20101221/31dce34f/attachment.htm>


More information about the Bldg-sim mailing list