[BLDG-SIM] max number of tracked modifications exceeded
Jeff Haberl
jeffhaberl at tees.tamus.edu
Wed Aug 22 11:55:45 PDT 2007
Why do you need so many zones? Five per floor is the usual, two can also suffice.
Jeff
BB 8=! 8=) :=) 8=) ;=) 8=) 8=( 8=) :=') 8=) 8=) 8=? BB
Jeff S. Haberl, Ph.D., P.E.............................jhaberl at esl.tamu.edu
Professor......................................................Office Ph: 979-845-6507
Department of Architecture.......................Lab Ph: 979-845-6065
Energy Systems Laboratory.......................FAX: 979-862-2457
Texas A&M University..............................77843-3581
College Station, Texas, USA.......................URL: www-esl.tamu.edu
BB 8=/ 8=) :=) 8=) ;=) 8=) 8=() 8=) 8=? 8=) 8=) 8= BB
----- Original Message -----
From: BLDG-SIM at gard.com <BLDG-SIM at gard.com>
To: BLDG-SIM at gard.com <BLDG-SIM at gard.com>
Sent: Wed Aug 22 12:29:23 2007
Subject: [BLDG-SIM] max number of tracked modifications exceeded
Ok, this could be embarrassing, but I got to know.
Could anyone shed some light on this error message I keep getting? As it turns out, I ended up with 405 zones. I heard Doe-2.1 was limited to 99zones, is there a new limit for Doe 2.2.
I was under the assumption that when modeling for LEED certification each space in the architectural design should be modeled as a separate space for building simulation, is this thought right or completely wrong? Thanks for the help.
Kevin
From: BLDG-SIM at gard.com [mailto:BLDG-SIM at gard.com] On Behalf Of Ramana Koti
Sent: Wednesday, August 22, 2007 11:50 AM
To: BLDG-SIM at gard.com
Cc: sbse at uidaho.edu
Subject: [BLDG-SIM] Renewable energy building projects
Dear all,
Is there a listing somewhere, of building projects with renewable energy installations (in the US or worldwide), say in the order of size of renewable energy installed etc?
Thanks,
Ramana Koti, LEED AP
Sustainable Building Analyst
ELEMENTS division of BNIM architects
106 W. 14th Street Suite 200
Kansas City, Missouri 64105
p 816.783.1635 f 816.783.1501
www.bnim.com| elements.bnim.com
==================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
More information about the Bldg-sim
mailing list