<div style="text-align: justify; ">Trying to document EAc1 for a LEED-NC trigeneration plant that produces chilled water, heating water and electricity. Step 1 and 2 Templates have been prepared following the USGBC May 2008 District Thermal document. It appears
that Step 2 trigeneration plant electricity should be recorded using USGBC November 2005 CHP Calculation Methodology since District Thermal document doesn’t address. </div>
<div style="text-align: justify; "> </div>
<div style="text-align: justify; ">How do you account for the trigeneration plant produced electricity in Step 2 Template? CHP document indicates all electricity obtained from district CHP is free. </div>
<div style="text-align: justify; "> </div>
<div style="text-align: justify; ">A manual post-processing spreadsheet was created that shows when electricity is provided from trigeneration plant and when purchased from local utility. The proposed building would consume the same energy amount in both Steps
therefore Table 1.8.2 listing end use consumptions would have same proposed building usage values. Only the energy source would change. Would the electricity obtained from trigeneration plant be credited through Exceptional Calculations in Step 2 Template using
local utility rate structures or through another method?</div>
<div style="text-align: justify; "> </div>
<div style="text-align: justify; ">Mark Zoeteman, FTC&H</div>