[Bldg-rate] Experience Modellers and LEED Canada v1.0

Aaron Smith asmith at mreng.ca
Mon Nov 28 14:20:28 PST 2011


Hello,

 

LEED Canada 2009 doesn't require energy simulations to be reviewed by a 3rd
party if they are prepared by "Experienced Modellers" (those currently on
the NRCan list).  Has anyone looked into whether submitting LEED Canada v1.0
simulations without a 3rd party review will be acceptable?  I don't see any
CIRs submitted yet.

 

Thanks,

Aaron

 

Aaron Smith, P.Eng 

LEEDR AP BD+C, M-ASHRAE, Mechanical Engineer



t: (902) 422-7393

f: (902) 423-4945

e:  <mailto:asmith at mreng.ca> asmith at mreng.ca

 

The electronic message contained herein is private and confidential,
intended only for the recipient(s) specified. If you have received this
message in error, please delete it and notify us immediately.  Any
accompanying files are supplied as a matter of courtesy only.  The data are
without warranty of any kind.  Any person or business making use of the data
is responsible for confirming its accuracy and completeness.  M&R
Engineering Ltd. is not responsible for edited or produced versions of this
digital information. 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-rate-onebuilding.org/attachments/20111128/464a647b/attachment-0005.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.jpg
Type: image/jpeg
Size: 1849 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/bldg-rate-onebuilding.org/attachments/20111128/464a647b/attachment-0005.jpg>


More information about the Bldg-rate mailing list