[Bldg-rate] LEED NC v2.2 EAc2

Zoeteman, Mark R. mrzoeteman at FTCH.com
Wed Apr 7 13:13:57 PDT 2010


Question about EAc2 On-Site Renewable Energy:

The v2.2 Reference Guide indicates:

In EAc1 example on page 191
Percent Renewable = Site-Generated Renewable/(Proposed Building Performance + Site-Generated Renewable)
3.0% = $2,639/$88,308

In EAc2 text in top right section of page 201
Percent Renewable = Site-Generated Renewable/Proposed Building Performance
3.1% = $2,639/$85,669


The value indicated in both places is 3.08 or 3.1%. However, when you plug in values for EAc1 example, result is 3.0%, which agrees with the example entered into a EAc2 Template.

Has anyone investigated this discrepancy with USGBC or GBCI?

Mark Zoeteman, FTC&H

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-rate-onebuilding.org/attachments/20100407/18a6fd24/attachment-0011.htm>