[Equest-users] GSHP with 3.61 and 3.63b. PV power usage

Umesh Atre umesh at innovativedesign.net
Thu Mar 4 13:33:39 PST 2010


 
Check the depth of your wells. I believe the defaults have changed in
3.63. Just a thought.
 
 
 

________________________________

From: equest-users-bounces at lists.onebuilding.org
[mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Varkie
C Thomas
Sent: Thursday, March 04, 2010 3:44 PM
To: Equest Users Mailing List
Subject: [Equest-users] GSHP with 3.61 and 3.63b. PV power usage



I tried to run 3,63b with a GSHP input file that ran with 3.61.  I got
the following caution and error messages shown below and the SIM reports
stopped after loads.  The BDL file shows that the program ran all the
way through with no error messages.  How do I fix the input for 3.63b so
that this 3.61 input file runs?

 
**CAUTION***************************************************************
*******

             In curve: CYCLING-PUMP                     the dependent
value

             is exceeding the limits.

             Value/Min/Max/First time:          1.015          0.020
1.000   1/ 2/ 8

 

 
***ERROR****************************************************************
*******

             Ground-loop HX: GROUND-HX-1                     

             is undersized for the load and is producing an extreme

             temperature of   -12F.  Mon/Day/Hr:  1/ 2/ 8

 

How does eQUEST distribute the PV generated power to lights, equipment,
cooling, pumps & fans in the BEPS report?  Can the details be viewed in
one of the other reports

Varkie

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100304/af0b1a7f/attachment.htm>


More information about the Equest-users mailing list