Hello,
 
I have two models of the same building, both are reporting unmet heating
hours.
 
The first is a packaged VAV system with 2 HVAC system definitions:
.         Core zones are served by DX coils for cooling and hot water
heating coils
.         It is a packaged VAV system with HW reheat
.         Perimeter zones have no cooling and HW baseboards
.         BEPS report indicates 69.6% of hours with any zone outside of
throttling range
 
The second is a heat pump system also with 2 HVAC system definitions:
.         Core zones are served by DX cooling coils and heat pump for
heating
.         It is a ground-source heat pump system
.         Perimeter zones have no cooling with HW baseboards
.         BEPS report indicates 44.5% of hours with any zone outside of
throttling range
 
Plant load is satisfied in both cases.
 
Any thoughts?
 
Thanks in advance.
 
 
Colleen Nelson, LEED-AP
Mechanical Engineering
Michaud Cooley Erickson
612.673.6995
 
 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20091013/e62d8a54/attachment.htm>
    
    
More information about the Equest-users
mailing list