[Equest-users] Unmet load hours
Erik Moore
Erik.Moore at arup.com
Wed Apr 29 03:04:57 PDT 2009
Hi there, I am leaving the systems (FC and SZRH) in the building to
self size. After simulating I've noticed that the zonal loads have a
number of hours that are unmet; and after looking through the SIM file I
have noted that the self sizing calculation (design day, report LS-B) is
not registering the equipment load in the affected spaces (even though
it is shown in the space loads, report LV-B).
Is there any way that I can force DOE to recognise these loads or do you
know if there is a specific reason that it is overlooking them?
Thanks in advance, Erik
____________________________________________________________
Electronic mail messages entering and leaving Arup business
systems are scanned for acceptability of content and viruses
More information about the Equest-users
mailing list