[Equest-users] eQuest Space Type Inputs

Matutinovic, Luka LMatutinovic at halsall.com
Wed Apr 8 13:21:57 PDT 2009


Hello,
 
I have a question regarding eQuest space type inputs.  I typically
create zones in the Wizard by tracing imported CAD drawings and zoning
according to perimeter/core, same HVAC system, similar loads or space
types.  However, when I get to the Activity Area Allocation screen
(screen 13 in the envelope wizard), I have to assign a percentage of
each space type to ALL the zones.  Once in the detailed mode, if I check
a particular zone, it says for example Office (67%).  Can I change this?
 
Is there a way to assign each zone only one space type and over-ride
this average area blending business.  It seems like a bad way to
correctly account for different space uses.  I guess the more important
question is: does it really matter?  I know eQuest allows you to assign
space types either to perimeter or core or both, so there was a
conscious decision to allocate space types based on perimeter and core
and I understand the rationale since internal and external loads are
quite different.  But why stop there? Why not allow full flexibility to
assign each zone a unique space type? 
 
Thanks,

 

Luka Matutinovic, B.A.Sc., LEED(r) AP

Green Building Consultant
 
T. 416.487.5257 ext. 317  
F. 416.487.9766  
Toll Free 1.888.425.7255
www.halsall.com 

HALSALL ASSOCIATES LTD. 
Toronto  Richmond Hill  Ottawa  Sudbury 
Burlington  Calgary  Vancouver  Dubai 

'50 Best Workplaces in Canada' 
2008 Globe and Mail

P Please consider the environment before printing this e-mail

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20090408/d635361c/attachment.htm>


More information about the Equest-users mailing list