All,
 
I was looking for some help on interpreting how a baseline 90.1 Appendix
G building should be modeled if the proposed building uses a dedicated
outside air unit.
 
My interpretation is that the baseline building should be modeled
without the 100% outside air unit (and per Table G3.1.1B), but in this
case could you add preheat coils to the baseline simulation main air
handling units, if not in the proposed? 

G3.1.2.3 Preheat Coils. If the HVAC system in the proposed

design has a preheat coil and a preheat coil can be modeled

in the baseline system, the baseline system shall be

modeled with a preheat coil controlled in the same manner as

the proposed design.

Thanks,

Jonathan Curtin



W  Y  L  I  E 
C O N S U L T I  N G
E  N G  I  N  E  E R S

6161 Savoy, Suite 700   Houston, Texas 77036
713.781.2526     713.781.2536 fax

www.wylieassociates.com <http://www.wylieassociates.com/> 


===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20071001/7a5935ad/attachment.htm>


More information about the Bldg-sim mailing list