[BLDG-SIM] eQUEST error message
Seth P. Spangler
sspangle at rmf.com
Wed Oct 31 11:39:10 PDT 2007
Hello,
I am trying to "fix" an eQUEST model a co-worker of mine started. I get
this error message for every zone that was created. Can anyone tell me
what it references or what is causing the error?
System: EL1 Sys7 (SZRH) (G.WNW2) could not successfully
allocate all energy to the 5-minute bins during
heating because of an equipment overload. The peak
load used in ECONOMICS will not include the fraction
due to the overload, but the PLANT reports will.
Mon/Day/Hour: 6 15 1 Energy: 8.9 Unallocated: 0.135
Thanks in advance for your help.
Seth Spangler, LEED(r) AP
Design Engineer
RMF Engineering, Inc
Ph: (843) 971-9639 ext:108
Fax: (843) 971-9641
sspangle at rmf.com <mailto:sspangle at rmf.com>
===========================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20071031/c6c7662e/attachment.htm>
More information about the Bldg-sim
mailing list